I just noticed that as you make changes to a model managed in TWC v19.0 a change set tracks any modification, deletion, or additions. Does the system currently store these change sets after commit? I would love to be able to trace a change set to a work item on JIRA or another issue management tool, as well as be able to see what each change set modified in the history.
Also is there a way to work on two separate change sets at the same time and commit them separately?
Thanks