Simulation Order Problem, Activity Diagram

Discussions about systems engineering product SysML functionalities

Moderator: Moderators

Simulation Order Problem, Activity Diagram

Postby mustafa.aydin@tubitak.gov.tr » Thu Dec 06, 2018 8:14 am

Hi,
The simulation of Cameo does not show that the activity is visited and wait for the object flows. It does not even send any Control Flow or Object Flow simultaneously after a fork node. Is there any body can explain that? OR How can I define that an activity is visited and it waits for the object flow(s), while some other branches in the diagram are about the generate those object flows?

Details&Example Case:
If I slow down and follow the steps of the simulation of activity diagram that have multiple branches, it does not match with the SysML knowlege I think.
If I use Fork nodes and send some object flow through the pins, the activity visit order is not simultaneous (this is what I expect after a fork node). Lets say after a fork node I want to tell one of the bracnhes is just waiting a signal, but instead, what my collegues see is some random delay between control flow and item flow.
I have attached a JEPG.
Simulation order snapshot of the activity diagram with fork node.png
You do not have the required permissions to view the files attached to this post.
mustafa.aydin@tubitak.gov.tr
Forum Newbie
Forum Newbie
 
Posts: 11
Posts Rating:0
Joined: Thu Mar 09, 2017 2:15 pm

Re: Simulation Order Problem, Activity Diagram

Postby Ketrey » Thu Jan 24, 2019 12:47 am

Hi,

could you upload your Simulation? Would be easier to identify the problem.


Ketrey
Ketrey
Forum Newbie
Forum Newbie
 
Posts: 22
Posts Rating:1
Joined: Wed Oct 10, 2018 6:57 am


Return to SysML

Who is online

Users browsing this forum: No registered users and 0 guests